News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Kendall Sustainable Infrastructure starts work on nearly 13-MW brownfield solar portfolio

admin by admin
October 4, 2023
in Solar Contractors
0
Kendall Sustainable Infrastructure starts work on nearly 13-MW brownfield solar portfolio
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Share

Kendall Sustainable Infrastructure (KSI) is partnering with AC Power and GreenSpark Solar on two brownfield solar sites in upstate New York that total 12.9 MW.

The two sites each re-purpose brownfield properties into productive clean energy-producing projects. The term brownfield refers to a site that is abandoned or otherwise unusable due to past industrial use or pollution/hazardous waste. The first project is 6.9 MW in Ft. Edward on a capped landfill, which is scheduled to come online at the end of 2023. The second project is a 6-MW array in Queensbury on former factory grounds that have previously undergone environmental remediation. Construction on this site is scheduled for 2024. AC Power developed the two projects, and KSI owns and will operate both facilities.

“These projects mark our continued commitment to the New York solar market. We now own and operate over 62 MW of solar projects in New York and over 120 MW total. The positive impacts of these projects in New York include jobs, clean energy, and re-purposing otherwise unusable land. They are now sources of clean energy bill savings to towns, companies, and households,” said John Chaimanis, co-founder of KSI.

New York-based GreenSpark Solar is serving as the contractor that is constructing both sites.

“As a nearly 25 year old business it is so important to have long standing, trusted partnerships like GreenSpark has with KSI, who we have been working with for over five years in bringing clean energy to NY State,” said Kevin Schulte, GreenSpark CEO. “GreenSpark has a history of using brownfields and landfills to move the renewable energy portfolio forward in NY and having a partner like KSI with a similar mission has been refreshing as we continue to grow.”

Power from the two newly built solar sites will benefit New York towns, households and businesses. They are part of NYSERDA’s renewable energy program.

News item from Kendall Sustainable Infrastructure

Source link

Previous Post

Leading Perth Solar Retailer Now Supplying Inverter Covers

Next Post

Is Going Solar Worth It?

admin

admin

Next Post
Is Going Solar Worth It?

Is Going Solar Worth It?

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
What Power Reliability Risks Lie Ahead for NSW?

What Power Reliability Risks Lie Ahead for NSW?

October 8, 2025
DOE adds hundreds more energy projects to termination list

DOE adds hundreds more energy projects to termination list

October 8, 2025
Paired Power and PHNXX develop assembly-free deployable solar microgrid

Paired Power and PHNXX develop assembly-free deployable solar microgrid

October 8, 2025
Sunstone Credit finances 2.8-MW shopping center solar portfolio

Sunstone Credit unveils commercial loan for standalone storage

October 8, 2025

Recent News

What Power Reliability Risks Lie Ahead for NSW?

What Power Reliability Risks Lie Ahead for NSW?

October 8, 2025
DOE adds hundreds more energy projects to termination list

DOE adds hundreds more energy projects to termination list

October 8, 2025
Paired Power and PHNXX develop assembly-free deployable solar microgrid

Paired Power and PHNXX develop assembly-free deployable solar microgrid

October 8, 2025
Sunstone Credit finances 2.8-MW shopping center solar portfolio

Sunstone Credit unveils commercial loan for standalone storage

October 8, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC