News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

National Grid Renewables starts work on two more large Ohio solar projects

admin by admin
November 16, 2023
in Solar Contractors
0
National Grid Renewables starts work on two more large Ohio solar projects
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter

Share

National Grid Renewables announced the start of onsite construction at neighboring projects in southern Ohio on November 16. Once operational, the Ross County Solar Project and the Fayette Solar Project will deliver a combined 167.5 MW of clean solar power.

“Ross and Fayette mark our second and third projects to break ground in Ohio, the first being our Yellowbud Solar Project in Ross and Pickaway counties,” said Joe Ibrahim, VP of construction and engineering at National Grid Renewables. “We’re excited to extend our partnership with communities both locally and statewide, and we look forward to bringing these projects through construction into operation to benefit our neighbors and landowners.”

Both projects are being constructed by Kiewit Power Constructors Co. and will use solar modules developed and produced by First Solar.

“The success of the Yellowbud Solar Project is the result of National Grid Renewables’ strong collaboration with First Solar, Kiewit, and the community,” said Jake Lathers, project manager for Kiewit Power Constructors Co. “We look forward to continuing this partnership through the construction of the Ross and Fayette solar projects, which will provide clean, reliable energy to the local area along with additional economic benefits and training opportunities.”

At 120 MW, Ross is anticipated to produce an estimated $27 million in new tax revenue throughout its first 25 years of operation. Fayette, a 47.5-MW project, is estimated to create $10.6 million in tax revenue during that same period. Together, the projects will also donate approximately $670,000 through local charitable funds.

News item from National Grid Renewables

Source link

Previous Post

Arizona governor attends groundbreaking for 300-MW solar project

Next Post

How to Choose the Right Plan for Your Needs

admin

admin

Next Post
How to Choose the Right Plan for Your Needs

How to Choose the Right Plan for Your Needs

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025

Recent News

EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC