News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

New California arena will sport 797-kW solar project

admin by admin
December 7, 2023
in Solar Contractors
0
New California arena will sport 797-kW solar project
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Frontwave Arena, the new 7,500 capacity venue in North San Diego County, California, has inked a local partnership with Baker Electric, for a renewable energy project that includes a fully integrated rooftop solar system array with a large-scale battery energy storage system for the sports and entertainment venue, and has signed a power purchase agreement with DSD Renewables to use the renewable energy produced at the site.

Credit: Frontwave Arena

“We are focusing on excellence in every aspect of development – from sustainable design to fan experience, from technology to community engagement,” said Josh Elias, COO of Frontwave Arena. “The solar installation is part of Frontwave Arena’s broader sustainability efforts to minimize the environmental impact of the arena. We have also committed to reducing water consumption, waste production and greenhouse gas emissions.”

Baker Electric will install a solar + storage project composed of a 1,350-panel, 797-kWDC solar system and 500-kW/1,100-kWh two-hour battery system.

Frontwave Arena, which is on schedule to open next summer, will be home to the 16-time champion indoor soccer team San Diego Sockers and configured to accommodate all types of indoor sports, concerts and community events. Frontwave Arena was designed to be the centerpiece of the Oceanside’s El Corazon, a 465-acre district where more than 80% of the property has been set aside for habitat and recreation.

“Baker Electric is excited to partner and assist with the development of a local landmark like Frontwave Arena,” said Scott Williams, Baker Electric executive VP. “We appreciate that not only are Josh and his team building a centerpiece of entertainment for the North County community, but they are not skipping any steps in consideration of the environmental impact of operating a facility of this size.”

Baker’s Renewables division focuses Baker’s engineering, procurement and construction project delivery methods on the utility-scale and commercial-industrial sectors, and is an Authorized Developer for DSD’s Developer Network. DSD will own, operate and maintain the solar and energy storage installation at Frontwave Arena.

News item from DSD Renewables

Source link

Previous Post

Pearl Certification releases IRA rebate calculator for homeowners

Next Post

Gov. Pritzker celebrates northern Illinois’s 100th community solar project

admin

admin

Next Post
Gov. Pritzker celebrates northern Illinois’s 100th community solar project

Gov. Pritzker celebrates northern Illinois's 100th community solar project

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025

Recent News

EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC