News Solartex
Advertisement
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

EV fast chargers in NY village run on solar + storage

admin by admin
December 8, 2023
in Solar Contractors
0
EV fast chargers in NY village run on solar + storage
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

A solar-supported EV fast charging station was recently put into service in Mount Kisco, New York. Sustainable Westchester supported the project featuring an 85-kW solar array, 180-kWh energy storage system and two Jule 75-kW DC fast chargers. Any excess electricity generated by the facility is prioritized for low-and moderate-income (LMI) households through Sustainable Westchester’s Community Solar program.

“By coupling renewable energy with electric vehicle charging, we are showing a powerful model demonstrating the potential of bringing projects to life which will make it possible to scale solutions that lower carbon emissions, reduce the use of fossil fuels, and create healthier places for us to live and work,” said NYSERDA President and CEO Doreen M. Harris. “We commend Sustainable Westchester on bringing this project to fruition, placing clean transportation at the core of the community and truly putting clean energy in the hands of more New Yorkers.”

The system was partially funded by a $250,000 grant through the New York State Department of Environmental Conservation Zero Emission Vehicle Infrastructure program, and also supported by the North American EV charger manufacturer Jule. The effort builds on recent progress to expand EV charging infrastructure in Westchester County, including the addition of 90 new stations by the City of Yonkers in April 2023, and 34 new stations by the Village of Tuckahoe.

The charging facility is located in a publicly accessible parking lot located at 40 Green Street, which is also the home of the County police, the Mount Kisco Village Court and the Mount Kisco Historical Society. The accessible charging hub serves not only as a modern amenity but also as a gateway to the local community.

News item from Sustainable Westchester

Source link

Previous Post

Benefits of Using Solar Power for Factories

Next Post

NYC relaxes zoning restrictions, opens 8,500 acres of parking lots to solar canopy development

admin

admin

Next Post
NYC relaxes zoning restrictions, opens 8,500 acres of parking lots to solar canopy development

NYC relaxes zoning restrictions, opens 8,500 acres of parking lots to solar canopy development

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
Adverse Weather Conditions Solar Panels

Adverse Weather Conditions Solar Panels

October 1, 2023
How many Solar Panels Do I Need?

How many Solar Panels Do I Need?

1
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
Anza launches energy storage supply chain analytics platform

Anza launches energy storage supply chain analytics platform

May 13, 2025
Transport company launches Solar Logistics Solutions

Transport company launches Solar Logistics Solutions

May 13, 2025
RWE contracts SOLARCYCLE for recycling decommissioned solar panels

RWE contracts SOLARCYCLE for recycling decommissioned solar panels

May 13, 2025
Trina to unveil 10-MWh ESS to North American market this summer

Trina Storage’s Elementa 2 Elevate system completes UL assessments

May 13, 2025

Recent News

Anza launches energy storage supply chain analytics platform

Anza launches energy storage supply chain analytics platform

May 13, 2025
Transport company launches Solar Logistics Solutions

Transport company launches Solar Logistics Solutions

May 13, 2025
RWE contracts SOLARCYCLE for recycling decommissioned solar panels

RWE contracts SOLARCYCLE for recycling decommissioned solar panels

May 13, 2025
Trina to unveil 10-MWh ESS to North American market this summer

Trina Storage’s Elementa 2 Elevate system completes UL assessments

May 13, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

  • Home
  • Categories
  • Privacy Policy
  • Term of Use
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA

©2024 SOLARTEX USA LLC

Cleantalk Pixel