News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

7.5-MW community solar project completed at Washington, D.C., university

admin by admin
June 5, 2024
in Solar Contractors
0
7.5-MW community solar project completed at Washington, D.C., university
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Share

A 7.5-MW solar project was recently completed for The Catholic University of America in Washington, D.C. The West Campus Solar Array was developed by Standard Solar.

Situated in the heart of Washington, D.C., the West Campus Solar Array will be fully operational this summer. Plans had been in the works to turn part of the little-used 40-acre parcel of land into a parking lot, but instead, it will now host a field of 42 rows of solar panels that provide 10,000 MWh hours of power to the university and the community.

“This West Campus solar farm project is not just a renewable energy venture; it’s a testament to The Catholic University of America’s dedication to creating a sustainable future for our nation and world,” said President Peter Kilpatrick, Catholic University. “As we illuminate our campus with clean energy, we also enlighten minds through education and invite the community to join us on this transformative journey toward a greener and more sustainable world.”

The West Campus Solar Array is the region’s largest urban ground-mount solar array, and is sited as a community solar project. The array will provide clean energy savings to over 1,200 subscribers within the community, benefiting District residents.

“Undertaking a project of this magnitude in an urban setting presents its challenges, but the potential rewards for the region are immense,” said Scott Wiater, President & CEO, Standard Solar. “The West Campus Solar Array will power the university sustainably and benefit the local community. It’s a true win-win scenario for all involved.”

News item from Standard Solar

Source link

Previous Post

Two solar projects come online in northern Mississippi

Next Post

Pivot Energy completes over-22-MW solar portfolio in Upstate New York

admin

admin

Next Post
Pivot Energy completes over-22-MW solar portfolio in Upstate New York

Pivot Energy completes over-22-MW solar portfolio in Upstate New York

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025

Recent News

EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC