News Solartex
Advertisement
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

MCE signs on for up to 400 MW of new solar + storage in Fresno County

admin by admin
July 29, 2024
in Solar Contractors
0
Solar industry admonishes CPUC’s revised proposal on community solar
0
SHARES
7
VIEWS
Share on FacebookShare on Twitter

Share

Golden State Clean Energy (GSCE) and MCE have agreed to work together toward California’s clean energy future, building much needed solar + battery storage resources in Fresno County. The master-planned development program known as the Valley Clean Infrastructure Plan aims to repurpose up to 130,000 acres of drainage-impaired or water-challenged lands within Westlands Water District in Fresno County to develop transmission infrastructure, solar generation and storage.

At full buildout the plan will include up to 20 GW of solar and 20 MW of energy storage, potentially providing up to one-sixth of California’s electricity requirements in 2035. MCE has entered into a Memorandum of Understanding (MOU) with GSCE for up to 400 MW each of solar and battery storage.

“This agreement with Golden State Clean Energy allows MCE to be deeply involved in the planning process for these resources,” said Vicken Kasarjian, MCE COO. “The project could provide MCE with a valuable solar and storage project and is a unique opportunity to build something really tailored to the needs of our customers and California as a whole.” MCE anticipates the project could provide MCE with:

  • 200-400 MW of solar
  • 200-400 MW of 4- or 8-hour battery storage
  • 100% renewable energy and the associated resource adequacy

This project will help MCE meet existing mid-term and long-term procurement needs with a goal of being commercially operable between 2028- 2030. The MOU allows MCE to consider the option to build the project directly or to purchase the resources through a Power Purchase Agreement. MCE’s potential portion of the project will generate enough electricity to power over 160,000 homes each year.

“We are thrilled that MCE will be the first customer in the Valley Clean Infrastructure Plan,” said Patrick Mealoy, COO at Golden State Clean Energy. “The plan is expected to benefit the communities in the valley by creating jobs, preserving family farms, while significantly bringing California closer to achieving its clean energy goals.”

News item from MCE

Source link

Previous Post

How to Claim Solar Tax Credits and Incentives

Next Post

Solar and the Summer Games

admin

admin

Next Post
Solar and the Summer Games

Solar and the Summer Games

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
Adverse Weather Conditions Solar Panels

Adverse Weather Conditions Solar Panels

October 1, 2023
How many Solar Panels Do I Need?

How many Solar Panels Do I Need?

1
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
Am I Eligible for the Federal Battery Rebate?

Am I Eligible for the Federal Battery Rebate?

May 12, 2025
Virginia governor vetoes bills that would have bolstered long-duration energy storage

Virginia governor vetoes bills that would have bolstered long-duration energy storage

May 12, 2025
Private equity buys Puerto Rico installer ISO Solar

Private equity buys Puerto Rico installer ISO Solar

May 12, 2025
SEG Solar starts production at cell factory in Indonesia

SEG Solar starts production at cell factory in Indonesia

May 12, 2025

Recent News

Am I Eligible for the Federal Battery Rebate?

Am I Eligible for the Federal Battery Rebate?

May 12, 2025
Virginia governor vetoes bills that would have bolstered long-duration energy storage

Virginia governor vetoes bills that would have bolstered long-duration energy storage

May 12, 2025
Private equity buys Puerto Rico installer ISO Solar

Private equity buys Puerto Rico installer ISO Solar

May 12, 2025
SEG Solar starts production at cell factory in Indonesia

SEG Solar starts production at cell factory in Indonesia

May 12, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

  • Home
  • Categories
  • Privacy Policy
  • Term of Use
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA

©2024 SOLARTEX USA LLC

Cleantalk Pixel