News Solartex
Advertisement
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Shuttered New Jersey compost facility hosts 19-MW solar project

admin by admin
October 9, 2024
in Solar Contractors
0
Shuttered New Jersey compost facility hosts 19-MW solar project
0
SHARES
17
VIEWS
Share on FacebookShare on Twitter

Share

CEP Renewables, NJR Clean Energy Ventures and CS Energy have completed the 19-MWDC Foul Rift solar project located in White Township of Warren County, New Jersey. The project was built on a brownfield, a substantially environmentally impaired site, that had been the home to a composting facility for nearly 30 years.

The 19-MW Foul Rift solar project in Warren County, New Jersey. CEP Renewables

“This project demonstrates both New Jersey’s strong policy support for brownfield and landfill solar projects, as well as the power of developing a grid supply solar farm to remediate environmental damages that would not have otherwise been addressed,” said Chris Ichter, executive VP at CEP. “We were able to draw upon our prior experience on similarly challenging brownfield and landfill solar projects to develop an effective public-private partnership with White Township that will positively impact generations to come.”

Prior to its closure, the facility had an extensive history of environmental violations from the New Jersey Department of Environmental Protection (NJDEP). When CEP initially encountered this property, it had been contaminated by the activities of the composting facility. An environmental investigation indicated that the soils were contaminated with metals, including polycyclic aromatic hydrocarbons and arsenic, that required the use of an institutional control.

The investigation uncovered a total of 92 distinct notices of environmental violations from NJDEP. To bring the site into compliance with regulations, CEP cleared the remaining compost berm and waste materials and negotiated a pre-purchase administrative consent order with NJDEP to effectively resolve the remaining violations and terminate the solid waste permit. CEP remediated environmental damage at the site while also providing reliable clean energy, pollinator habitats and greater tax revenue for the local community.

Similar to CEP’s Mount Olive and BEMS landfill solar projects, the Foul Rift project was also acquired through the redevelopment and tax lien foreclosure process, a method that was unprecedented prior to the Mount Olive project. CEP addressed the site’s millions of dollars in tax liens accrued by forming a public-private partnership with the White Township that involved CEP acquiring the tax liens from the township, paying back all past-due taxes and foreclosing on the property. CEP is now the owner of the site, and the White Township has been able to recoup roughly three decades of interest and back taxes.

Not only has the Foul Rift project turned an environmentally hazardous site into a revenue generating asset, it has also contributed to New Jersey maintaining its ranking as the U.S. state with the most installed solar capacity per-square-mile.

News item from CEP Renewables

Source link

Previous Post

Photovoltaic upgrade in Jiaxing, China significantly boosts power output

Next Post

Enabling distributed battery owners in every state to earn compensation – pv magazine USA

admin

admin

Next Post
Enabling distributed battery owners in every state to earn compensation – pv magazine USA

Enabling distributed battery owners in every state to earn compensation – pv magazine USA

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
Adverse Weather Conditions Solar Panels

Adverse Weather Conditions Solar Panels

October 1, 2023
How many Solar Panels Do I Need?

How many Solar Panels Do I Need?

1
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
RWE contracts SOLARCYCLE for recycling decommissioned solar panels

RWE contracts SOLARCYCLE for recycling decommissioned solar panels

May 13, 2025
Trina to unveil 10-MWh ESS to North American market this summer

Trina Storage’s Elementa 2 Elevate system completes UL assessments

May 13, 2025
Silfab sells off $110 million of 45X manufacturing tax credits

Silfab sells off $110 million of 45X manufacturing tax credits

May 13, 2025
RWE begins construction on nearly 100-MW Ohio solar project

RWE begins construction on nearly 100-MW Ohio solar project

May 13, 2025

Recent News

RWE contracts SOLARCYCLE for recycling decommissioned solar panels

RWE contracts SOLARCYCLE for recycling decommissioned solar panels

May 13, 2025
Trina to unveil 10-MWh ESS to North American market this summer

Trina Storage’s Elementa 2 Elevate system completes UL assessments

May 13, 2025
Silfab sells off $110 million of 45X manufacturing tax credits

Silfab sells off $110 million of 45X manufacturing tax credits

May 13, 2025
RWE begins construction on nearly 100-MW Ohio solar project

RWE begins construction on nearly 100-MW Ohio solar project

May 13, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

  • Home
  • Categories
  • Privacy Policy
  • Term of Use
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA

©2024 SOLARTEX USA LLC

Cleantalk Pixel