News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Arevon completes Phase 1 of 758-MW solar + storage project in Southern California

admin by admin
December 9, 2024
in Solar Contractors
0
Arevon completes Phase 1 of 758-MW solar + storage project in Southern California
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Share

Arevon Energy announced the start of operations at its Eland 1 Solar-plus-Storage Project in Kern County, California. Eland 1 Solar-plus-Storage, based in the city of Mojave, is a 384-MWDC solar project coupled with 150-MW/600-MWh of energy storage.

A second phase of the Eland Solar-plus-Storage Project is currently under construction and is anticipated to be operational in Q1 2025.  When both phases are completed, the projects’ combined capacity will total 758 MWDC of solar with 300 MW/1,200 MWh of energy storage.

Eland’s solar and storage configuration enables it to deliver a reliable, predictable energy yield during peak electricity demand periods to the Southern California region. Combining solar panels and battery storage systems play a crucial role in maintaining a steady supply of renewable power, enhancing grid resilience, and responding to critical demand challenges.

Eland 1 is under a long-term power purchase agreement with Southern California Public Power Authority, which will administer the contract for two of its members: Los Angeles Department of Water and Power (LADWP) and Glendale Water and Power. San Diego-headquartered SOLV Energy led the engineering, procurement and construction activities for the project.

News item from Arevon

Source link

Previous Post

Jinko files TOPCon patent infringement claim against Toyo, VSUN

Next Post

SolarEdge now shipping U.S.-made residential batteries

admin

admin

Next Post
SolarEdge now shipping U.S.-made residential batteries

SolarEdge now shipping U.S.-made residential batteries

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025

Recent News

EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC