News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Meta spurs 396-MW solar project development from Cypress Creek

admin by admin
February 26, 2025
in Solar Contractors
0
Meta inks deal with Pine Gate for new 204-MW solar project
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Share

Facebook parent company Meta has signed a landmark environmental attribute purchase agreement (EAPA) that will enable Cypress Creek Renewables to construct a 396-MWAC/505-MWDC solar facility in Texas, supporting the social media platform’s goal to match its operations with 100% clean and renewable energy.

The new solar facility, Hanson Solar, will be owned and operated by Cypress Creek in Coleman County, Texas. Once operational, the project will deliver electricity to the ERCOT grid.

“We are thrilled to expand our partnership with Meta and provide them with the clean energy needed to support their data center operations and sustainability goals,” said Sarah Slusser, CEO of Cypress Creek. “Hanson Solar represents a transformative milestone for our company, strengthening our growth, enhancing energy independence, and driving millions of dollars in economic benefits for our host community.”

Hanson Solar is expected to provide more than $80 million in local tax revenue and create more than 300 jobs during construction.

“We are thrilled to collaborate with Cypress Creek Renewables to bring solar energy to the grid in Texas — and support our operations in the region with clean and renewable energy,” said Urvi Parekh, head of global energy at Meta. “We look forward to this project becoming operational.”

Construction of Hanson Solar is scheduled to begin later this year, with operations expected to commence in 2027.

News item from Cypress Creek Renewables

Source link

Previous Post

BESS Company in Faridabad, Haryana

Next Post

GameChange Solar deploys trackers on 2-kV pilot PV project

admin

admin

Next Post
GameChange Solar deploys trackers on 2-kV pilot PV project

GameChange Solar deploys trackers on 2-kV pilot PV project

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025

Recent News

EPRI launches Interoperability Lab to advance DER integration

TotalEnergies completes 7-MW solar project on closed Maryland landfill

October 10, 2025
Electrical grid interconnection backlog grew 30% in 2023

New Mexico offers $70 million in grants for grid updates to accommodate more renewables

October 10, 2025
SEIA finalizes new national standard for solar supply chain traceability

SEIA finalizes new national standard for solar supply chain traceability

October 10, 2025
How to fast-track solar permitting to avoid costly delays

How to fast-track solar permitting to avoid costly delays

October 10, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC