News Solartex
Advertisement
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Alliant Energy completes largest solar project in Iowa

admin by admin
April 29, 2025
in Solar Contractors
0
Alliant Energy completes largest solar project in Iowa
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Share

Another Alliant Energy solar project in Wisconsin.

Alliant Energy has announced a 200-MW solar facility in Linn County is now operational and generating energy for customers. The site is being renamed to Pleasant Creek Solar after being known as Duane Arnold Solar during development and construction.

The 200-MW Pleasant Creek Solar facility — the largest solar project in Iowa — is expected to generate enough electricity to power approximately 40,000 homes annually. Combined with the Creston and Wever solar projects that Alliant Energy placed into service in 2024, the energy company is now generating 400 MW of new solar energy resources in Iowa. These solar projects complement the approximately 1,300 MW of wind resources Alliant Energy owns and operates in the state.

“Pleasant Creek Solar exemplifies our “all of the above” energy strategy, resulting in cost-effective energy resources that increase reliability for customers,” said Mayuri Farlinger, president of Alliant Energy’s Iowa energy company and VP of operations. “Our solar projects and energy system investments drive economic growth by attracting businesses to communities, creating jobs and boosting tax revenues.

The new name — Pleasant Creek Solar — pays homage to Pleasant Creek Lake, a man-made lake near the project site created when the Duane Arnold Energy Center was built. The lake served as an emergency water source for the generating plant.

The project in Linn County, now owned by Alliant Energy, was developed by Duane Arnold Solar LLC, a subsidiary of NextEra Energy Resources LLC.

Construction was completed in two phases. The first 50 MW began operating in March 2024 while the remaining 150 MW was placed into service in December 2024.

“We appreciate the partnership with NextEra Energy Resources, local officials and landowners to help us continue delivering safe, reliable energy to benefit our customers and the communities we serve,” said Farlinger. “It’s one more way we deliver on our purpose to serve customers and build stronger communities.”

News item from Alliant Energy

Source link

Previous Post

Why Switching Off at the Wall Could Save Your Home and Your Life

Next Post

Residential solar and storage prices hit all-time low in 2024

admin

admin

Next Post
Report finds 43 states took solar policy action in Q1 this year

Residential solar and storage prices hit all-time low in 2024

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
Adverse Weather Conditions Solar Panels

Adverse Weather Conditions Solar Panels

October 1, 2023
How many Solar Panels Do I Need?

How many Solar Panels Do I Need?

1
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
Is It Used in the Renewable Energy Industry?

Is It Used in the Renewable Energy Industry?

June 15, 2025
Should You Add a Battery to Your Solar Panels?

Should You Add a Battery to Your Solar Panels?

June 15, 2025
Mayfield Renewables announces 2025 Education Summit in Seattle

Mayfield Renewables announces 2025 Education Summit in Seattle

June 13, 2025
Yaskawa America to invest $180 million in Wisconsin manufacturing plant

Yaskawa America to invest $180 million in Wisconsin manufacturing plant

June 13, 2025

Recent News

Is It Used in the Renewable Energy Industry?

Is It Used in the Renewable Energy Industry?

June 15, 2025
Should You Add a Battery to Your Solar Panels?

Should You Add a Battery to Your Solar Panels?

June 15, 2025
Mayfield Renewables announces 2025 Education Summit in Seattle

Mayfield Renewables announces 2025 Education Summit in Seattle

June 13, 2025
Yaskawa America to invest $180 million in Wisconsin manufacturing plant

Yaskawa America to invest $180 million in Wisconsin manufacturing plant

June 13, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

  • Home
  • Categories
  • Privacy Policy
  • Term of Use
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA

©2024 SOLARTEX USA LLC

Cleantalk Pixel