Solar tracker manufacturer Ideematec has extended its strategic partnership with Parliament Energy Holdings (PEH), the company responsible for the 640-MWDC Parliament Solar project in Waller County, Texas. Parliament Solar sustained no damage from both Hurricane Beryl and 10 on-site hail events during the construction phase and is now moving into operations.

Parliament Solar, a 640 MWDC site north of Houston, TX spans over 3,000 acres with over 6,000 Ideematec L:TEC 1P trackers.
Ideematec will supply its Horizon L:TEC 1P trackers for PEH’s upcoming 2.1 GW project pipeline in Texas. The first project in this pipeline — a 650-MWDC installation located south of Dallas — is scheduled to begin construction in late 2025.
“Our strong track record in hurricane-prone regions, combined with our hail-stow design process, gives PEH the confidence that the L:TEC 1P design can withstand both high winds and hail events—even when they occur simultaneously,” said Philipp Klemm, CEO of Ideematec.
News item from Ideematec