News Solartex
Advertisement
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

SMUD signs PPA for 640-MWh battery still under construction in Sacramento County

admin by admin
June 20, 2025
in Solar Contractors
0
SMUD signs PPA for 640-MWh battery still under construction in Sacramento County
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

DESRI and the Sacramento Municipal Utility District (SMUD) have executed a long-term PPA for the Dry Creek Energy Storage project. Dry Creek is a 160-MW/640-MWh battery energy storage system (BESS) located in Sacramento County.

“Our DESRI team is proud to bring this reliable, cost-effective clean energy storage project to the California energy system, an exciting new addition to our partnership with SMUD over many years,” said DESRI Chief Development Officer Hy Martin. “This project will play a critical role in helping SMUD to maintain and enhance grid reliability, optimize performance of their renewable energy assets and contribute to their decarbonization goals.”

SMUD and DESRI have worked on the project jointly over several years. Given the significant transmission infrastructure at the decommissioned Rancho Seco generating station, the BESS is optimally located to leverage the existing infrastructure and limit costly upgrades on the system. The energy storage system will be charged using renewable energy and other clean sources available on SMUD’s grid, supporting the integration of sustainable power and enhancing grid reliability.

“This battery storage project represents another significant milestone in SMUD’s Zero Carbon Plan as we work toward carbon-free electricity by 2030,” said SMUD Chief Zero Carbon Officer Lora Anguay. “By enhancing our existing renewable infrastructure at Rancho Seco with battery technology, we’re building a more flexible and reliable grid while enabling a more efficient integration of renewable energy.”

News item from SMUD

Source link

Previous Post

Europe’s lithium quest hampered by China and lack of cash

Next Post

Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

admin

admin

Next Post
Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
Adverse Weather Conditions Solar Panels

Adverse Weather Conditions Solar Panels

October 1, 2023
How many Solar Panels Do I Need?

How many Solar Panels Do I Need?

1
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

June 20, 2025
SMUD signs PPA for 640-MWh battery still under construction in Sacramento County

SMUD signs PPA for 640-MWh battery still under construction in Sacramento County

June 20, 2025
Bosnia’s lithium discovery raises hopes and fears

Europe’s lithium quest hampered by China and lack of cash

June 20, 2025
Solar for Heritage and Older Homes

Solar for Heritage and Older Homes

June 19, 2025

Recent News

Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

Average residential solar project $9,000 more without tax credit, said EnergySage – pv magazine USA

June 20, 2025
SMUD signs PPA for 640-MWh battery still under construction in Sacramento County

SMUD signs PPA for 640-MWh battery still under construction in Sacramento County

June 20, 2025
Bosnia’s lithium discovery raises hopes and fears

Europe’s lithium quest hampered by China and lack of cash

June 20, 2025
Solar for Heritage and Older Homes

Solar for Heritage and Older Homes

June 19, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

  • Home
  • Categories
  • Privacy Policy
  • Term of Use
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • CATEGORIES
    • Solar Panels
    • Solar Installation
    • Residential Solar
    • Commercial Solar
    • Solar Contractors
    • Solar Batteries
    • Solar Inverters
    • Solar Lightening
    • Solar Pumps
    • Accessories
  • MORE
    • CONTACT US
    • SOLARTEX USA

©2024 SOLARTEX USA LLC

Cleantalk Pixel