News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Panels

Environment fears over $6 bn Indonesia EV battery project: NGOs

admin by admin
June 26, 2025
in Solar Panels
0
Bipartisan bill addressing lithium-ion battery fires awaits congressional action
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Environment fears over $6 bn Indonesia EV battery project: NGOs

by AFP Staff Writers

Jakarta (AFP) June 26, 2025






Environmental groups raised concerns Thursday over a $6 billion Indonesian EV battery megaproject backed by Chinese giant CATL which is set to open on a once-pristine island, as Jakarta exploits its huge supply of nickel.

Indonesia is both the world’s largest nickel producer and home to the biggest-known reserves, and a 2020 export ban has spurred a domestic industrial boom.

Indonesian President Prabowo Subianto will inaugurate the project — also backed by China’s Zhejiang Huayou Cobalt and Indonesia’s state-owned Antam — in the east of Halmahera in Indonesia’s Maluku islands on Sunday.

The complex will encompass a process from nickel mining to production of cathodes, state news agency Antara reported.

But NGOs say Indonesia and the Chinese firms involved have not given assurances about environmental protections at the site, located just kilometres from a huge industrial park where spikes in pollution and deforestation have been reported.

“CATL, Huayou Cobalt, PT Antam… must commit to respecting the rights of local communities and the environment before breaking ground,” said Brad Adams, executive director at Climate Rights International, in a statement.

“Communities are repressed, forests are cleared, and pollution goes unaddressed with impunity. This is a chance for the Prabowo government to show that it has learned from those failures.”

The presidential office did not immediately respond to an AFP request for comment.

Halmahera hosts the world’s largest nickel mine by production Weda Bay, where operations have grown and sparked reports of widespread environmental damage.

Greenpeace Indonesia said the new project carried “great responsibilities” and the environment and locals “must not take a back seat” to powering electric vehicles.

“If the environment and the rights of our most vulnerable people are not prioritised now… we will all pay a high price through worsening biodiversity and climate crises,” Arie Rompas, forest campaign team leader at Greenpeace, told AFP.

A CRI report this month warned the Indonesian government was allowing environmental damage to go unchecked around Weda Bay.

An AFP report last month detailed how the home of the nomadic Hongana Manyawa tribe was being eaten away by the mine.

jfx/mtp

CATL

COBALT INTERNATIONAL ENERGY

Related Links

Powering The World in the 21st Century at Energy-Daily.com



Source link

Previous Post

Namaste Solar completes rooftop project for City of Boulder

Next Post

120-MW agrivoltaic solar project in Ohio approved for construction

admin

admin

Next Post
National Grid Renewables begins building 100-MW Wisconsin solar project

120-MW agrivoltaic solar project in Ohio approved for construction

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0

Кабинет клиента InstaForex – Solar Panels Philippines

September 30, 2025
EPRI launches Interoperability Lab to advance DER integration

Connecticut manufacturer works with Budderfly to add 230-kW solar array

September 30, 2025
Etica immersion-cooled lithium batteries reach UL 1973 compliance

Etica immersion-cooled lithium batteries reach UL 1973 compliance

September 30, 2025

Лучший экономический календарь Форекс на сегодня, новости онлайн – Solar Panels Philippines

September 30, 2025

Recent News

Кабинет клиента InstaForex – Solar Panels Philippines

September 30, 2025
EPRI launches Interoperability Lab to advance DER integration

Connecticut manufacturer works with Budderfly to add 230-kW solar array

September 30, 2025
Etica immersion-cooled lithium batteries reach UL 1973 compliance

Etica immersion-cooled lithium batteries reach UL 1973 compliance

September 30, 2025

Лучший экономический календарь Форекс на сегодня, новости онлайн – Solar Panels Philippines

September 30, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC