News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Solar for All beneficiaries sue EPA for terminating program

admin by admin
October 6, 2025
in Solar Contractors
0
Evergrow completes first IRA tax credit transfer through solar project in Connecticut
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

On Oct. 6, the Southern Environmental Law Center (SELC), Lawyers for Good Government and others filed a lawsuit in the United States District Court for the District of Rhode Island on behalf of beneficiaries of the Solar for All program to restore the program that the U.S. Environmental Protection Agency (EPA) sought to terminate in July.

Plaintiffs include the Rhode Island AFL-CIO, a statewide organization of trade unions representing more than 80,000 people, solar businesses, nonprofits and an individual homeowner that had applied to participate in the Georgia Bright rooftop solar program launched last July.

The Solar for All program was designed to provide a minimum of 20% savings to low-income American households on their utility bills using solar, the cheapest source of new electricity generation. Based on an analysis of all work plans done by the Clean Energy States Alliance (CESA), Solar for All programs could provide utility bill savings up to 70% for single-family households for the next 20 years, from $495 to $1,400 in household savings per year.

Less than two months ago, EPA sent letters of termination to all 60 Solar for All grantees in which it stated EPA no longer possessed (a) the substantive legal authority or (b) the financial appropriations needed to continue implementation of the program following passage of the One Big Beautiful Bill (HR1) by Congress.

CESA staff believe that both assertions are factually and legally incorrect.

First, EPA not only still possesses the legal authority to administer the Solar for All program, but is required by Congress to do so. HR1 did not terminate the Solar for All program. Neither the language in the statute nor the congressional record support termination of the program. Further, HR1 did not retroactively repeal the authorizing statute (Section 134 of the Clean Air Act).

Only if HR1 had been made retroactive could it have changed the legal status of a program that was already in its implementation phase and for which funds were obligated. Obligation in this context is a legal term referring to a firm commitment of funds by the federal government. All Solar for All funds have been obligated since September 2024, almost a year before HR1.

In addition, Congress neither required nor instructed EPA to terminate the Solar for All program, a popular program aimed at lowering the cost of power and supported on both sides of the aisle, covering households in every state. In fact, EPA was required to obligate the funds before the end of September 2024 and to administer the programs by the Inflation Reduction Act. HR1 does not provide any express or implied legal authority for EPA to take any action on the Solar for All program other than to continue implementation in compliance with the law.

Second, HR1 did not rescind any Solar for All program funds as Congress, specifically and unambiguously, only rescinded unobligated funds. According to Congress, the only unobligated funds under Section 134 of the Clean Air Act were $19 million of administrative funds, a far cry from $7 billion of program funds.

“This lawsuit is a welcome step,” said CESA’s deputy director Vero Bourg-Meyer. “We hope that EPA reverses course so that Solar for All grantees can all return to work, delivering savings to American households.”

As this first lawsuit relevant to the Solar for All program is launched, EPA has not lifted its stop-work orders. States and other grantees are continuing to consider all legal options open to them.

News item from CESA

Source link

Previous Post

Xcel Energy proposes 200-MW distributed battery storage network across Minnesota

Next Post

District court rules renewable energy must be considered in Puerto Rico energy rebuild

admin

admin

Next Post
District court rules renewable energy must be considered in Puerto Rico energy rebuild

District court rules renewable energy must be considered in Puerto Rico energy rebuild

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
District court rules renewable energy must be considered in Puerto Rico energy rebuild

District court rules renewable energy must be considered in Puerto Rico energy rebuild

October 6, 2025
Evergrow completes first IRA tax credit transfer through solar project in Connecticut

Solar for All beneficiaries sue EPA for terminating program

October 6, 2025
Xcel Energy proposes 200-MW distributed battery storage network across Minnesota

Xcel Energy proposes 200-MW distributed battery storage network across Minnesota

October 6, 2025
WattFlow launches new proposal software for C&I energy storage, microgrids

WattFlow launches new proposal software for C&I energy storage, microgrids

October 6, 2025

Recent News

District court rules renewable energy must be considered in Puerto Rico energy rebuild

District court rules renewable energy must be considered in Puerto Rico energy rebuild

October 6, 2025
Evergrow completes first IRA tax credit transfer through solar project in Connecticut

Solar for All beneficiaries sue EPA for terminating program

October 6, 2025
Xcel Energy proposes 200-MW distributed battery storage network across Minnesota

Xcel Energy proposes 200-MW distributed battery storage network across Minnesota

October 6, 2025
WattFlow launches new proposal software for C&I energy storage, microgrids

WattFlow launches new proposal software for C&I energy storage, microgrids

October 6, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC