News Solartex
Advertisement
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Oregon travel plaza adds fast EV chargers powered by 40 kW of solar + storage

admin by admin
October 15, 2025
in Solar Contractors
0
Oregon travel plaza adds fast EV chargers powered by 40 kW of solar + storage
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

High-power EV charging company XCharge North America announced a new partnership with Wildhorse Resort & Casino’s Arrowhead Travel Plaza to deploy four, dual-dispenser GridLink chargers powered by 40 kW of solar energy.

As part of the Wildhorse Resort & Casino enterprises on tribal lands of the Confederated Tribes of the Umatilla Indian Reservation, the Arrowhead Travel Plaza serves over 1.7 million vehicles on Interstate 84, a key transportation corridor.

Read about SEIA and the Alliance for Tribal Clean Energy’s new guide to help clean energy developers build equitable partnerships with Tribal Nations.

This new deployment in Pendleton, Oregon will not only provide Arrowhead Travel Plaza’s growing EV customer base with a fast, efficient and reliable charging experience but will also serve as the first solar + storage DC fast-charging station in the state.

This installation was made possible by NetZero Energy, which identified the initial opportunity for collaboration and provided essential services, including due diligence, system design and comprehensive project management, acting as a pivotal partner in bringing this state-first deployment online.

“We partnered with XCharge NA because they provide a grid-friendly charging solution with battery storage that seamlessly integrates with a custom solar canopy — a perfect fit for our climate,” said Tom Fine, general manager of Arrowhead Travel Plaza. “Their technology provides clear operational and economic advantages that assist Arrowhead Travel Plaza in providing a needed service for the broadening customer base.”

GridLink provides advanced bidirectional charging technology, seamless grid integration and renewable energy support, including direct integration with solar PV. The bidirectional charging technology allows power to flow back into the grid or act as an off-grid energy source, enhancing overall grid stability. This also allows GridLink to function off-grid in the event of an emergency.

News item from XCharge NA

Source link

Previous Post

Short film ‘Pastures and Panels’ spotlights solar grazing movement in US

Next Post

Geronimo Power starts construction on 150-MW solar project for Illinois utility

admin

admin

Next Post
Geronimo Power starts construction on 150-MW solar project for Illinois utility

Geronimo Power starts construction on 150-MW solar project for Illinois utility

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

May 15, 2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

October 1, 2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

November 2, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

September 29, 2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
RatedPower releases 3D Energy performance simulation tool

RatedPower releases 3D Energy performance simulation tool

October 15, 2025
Pros, Cons & Future of EVs

Pros, Cons & Future of EVs

October 15, 2025
Nautilus Solar completes 5-MW community solar project along Illinois Highway 20

Nautilus Solar completes 5-MW community solar project along Illinois Highway 20

October 15, 2025
Geronimo Power starts construction on 150-MW solar project for Illinois utility

Geronimo Power starts construction on 150-MW solar project for Illinois utility

October 15, 2025

Recent News

RatedPower releases 3D Energy performance simulation tool

RatedPower releases 3D Energy performance simulation tool

October 15, 2025
Pros, Cons & Future of EVs

Pros, Cons & Future of EVs

October 15, 2025
Nautilus Solar completes 5-MW community solar project along Illinois Highway 20

Nautilus Solar completes 5-MW community solar project along Illinois Highway 20

October 15, 2025
Geronimo Power starts construction on 150-MW solar project for Illinois utility

Geronimo Power starts construction on 150-MW solar project for Illinois utility

October 15, 2025
News Solartex

©2024 SOLARTEX USA LLC

Navigate Site

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Home 2
  • Home 3
  • Home 4
  • Home 5
  • Home 6
  • Privacy Policy
  • Sample Page
  • Term of Use

©2024 SOLARTEX USA LLC